Barge Canal Trail Phase I Improvement Project

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

 

Status: 

Completed 

 

Location: 

Between the bridge at Lake Washington Boulevard to Jefferson Blvd and connects to Jefferson at two locations: at the intersection of Jefferson and Locks Drive and to the existing western Jefferson sidewalk just south of the Jefferson bridge. 

  

Description or Scope: 

The Barge Canal trail Project is an exciting project that is part of the larger Pioneer Bluff and Stone Lock Master Plan area.  The project includes construction of a 12 ft wide asphalt path with two adjacent two-foot aggregate base shoulders; security lighting, seating areas with standard street furnishings, such as, benches and above ground trash receptacles and incorporates found artifacts from the Stone Locks Facility’s outbuildings as aesthetics treatments. Additionally, there will be removal of an existing sidewalk ramp at Jefferson and Locks Drive, construction of a new sidewalk ramp, reconstruction of sidewalk, and pavement striping are also included. 

 

Project Benefits: 

This project significantly advances the 2018 Strategic Plan Policy Agenda Top Priority items “Flood Protection”, “Pioneer Bluff/Stone Lock Reuse Master Plan”, and “Bicycle, Pedestrian and Trail Improvements.”, by making the Barge Canal more attractive to both the public and to potential developers. Additionally, its timing will enhance flood protection and environmental awareness. 

 

Schedule: 

May 2019 to September 2019 

 

Last Edited 

4/13/2022